Financial close achieved on new Calcasieu River Bridge Project

NewsFinancial close achieved on new Calcasieu River Bridge Project
The brand logo
Plenary Americas

AmericasTransport

15 Aug 2024

Plenary Americas and its Calcasieu Bridge Partners (CBP) consortium have reached financial close on the $2.3 billion Interstate 10 Calcasieu River Bridge project which will connect the towns of Lake Charles and Westlake in Louisiana.

The current I-10 Calcasieu River Bridge is more than 70 years old and predates the interstate system. Unlike most modern bridges, it is narrow, has steep approach grades and lacks shoulders and lighting. The new bridge will be less steep, have additional lanes, full shoulders and roadway lighting, providing the residents of Southwest Louisiana with a modern, safe, and more reliable bridge across the Calcasieu River.

Specifically, the scope of the project includes:

  • Design and construction of a new eight-lane bridge over the Calcasieu River with three travel lanes and one auxiliary lane in each direction.
  • Modification and relocation of existing roadways and interchanges.
  • Demolition and removal of the existing Calcasieu River Bridge once traffic is transferred to the new bridge.
  • Operations and maintenance of the new bridge and associated roadway for 50 years.
  • Roadside and back-office systems for toll revenue collection that is interoperable with existing LA tolling systems and the Central States US Hub.
  • Tolling operations, including a customer service center.

The project will be financed through both public and private sources. The State of Louisiana will contribute close to US$1.2 billion during construction while the long-term financing includes US$1.33 billion in tax-exempt Private Activity Bonds. Private capital will be repaid over the concession with toll revenues.

CBP will now begin the design-build phase of the project, with construction expected to begin in 2026 and be completed in 2031.

Members of the CBP team include:

  • Lead developer and equity member: Plenary Americas
  • Equity members: ACCIONA and Sacyr
  • Design-Build Joint Venture: ACCIONA and Sacyr
  • Tolling Operator: Kapsch
  • Operations & Maintenance: Plenary Americas, ACCIONA and Sacyr

The Louisiana Department of Transportation & Development news release can be found here.

Stephanie Williamson

Senior Vice President, Corporate Affairs

Contact via email

Related news

Plenary achieves commercial close for new Calcasieu River Bridge project in Louisiana image

Plenary achieves commercial close for new Calcasieu River Bridge project in Louisiana

Plenary’s Calcasieu Bridge Partners team is thrilled to announce it has achieved commercial close with the Louisiana Department of Transportation…

Americas

31 January 2024

Plenary Infrastructure awarded electronic tolling project in Louisiana image

Plenary Infrastructure awarded electronic tolling project in Louisiana

Plenary Infrastructure Belle Chasse (PIBC) has been awarded a contract by the Louisiana Department of Transportation and Development (LADOTD) to…

Americas

24 June 2021

Contract signed for Belle Chasse Bridge and Tunnel Replacement Project image

Contract signed for Belle Chasse Bridge and Tunnel Replacement Project

Gov. John Bel Edwards and Louisiana Department of Transportation and Development Secretary Shawn D. Wilson, Ph.D., announced the execution of…

Americas

20 December 2019

Plenary Americas


©️ Plenary Americas 2024