Masthead Image

Long Beach Civic Center Redevelopment

ProjectLong Beach Civic Center Redevelopment
The brand logo
Plenary Americas

AmericasGovernment accommodation
Download PDF fact sheet

The Project includes the creation of a new City Hall, a new Main Library, a revitalized Lincoln Park, parking facilities, and a new Port of Long Beach headquarters, as well as complementary private development in downtown Long Beach.

Plenary Properties Long Beach (PPLB) will develop, design, build and finance the new Civic Center, and will then manage operations and maintenance over a 40-year concession period. By utilizing a public-private partnership model, the City of Long Beach is able to produce this redeveloped Civic Center costing less than it currently pays to use and maintain existing facilities.

Project facts

Location

Long Beach, California, USA

Client

City and the Port of Long Beach

Value (NPV)

US$520 million

Consortium

Plenary Properties Long Beach (PPLB)

Plenary Americas' role

Lead developer

Equity investor

Financial arranger

Builder

Clark Construction Group – California LP

Architect

Skidmore, Owings & Merrill LLP

Services

Johnsons Controls, Inc.

Financial close date

April 2016

Completion date

June 2019

Contract terms

40 years, DBFOM

Awards

  • North American P3 Bond Deal of the Year, 2017 IJGlobal Awards
  • Best Social Infrastructure, 2016 P3 Bulletin
  • Project Grand Prix, 2016 P3 Bulletin
  • Merit in Urban Design, 2016 The American Planning Association LA

Design features

The New Main Library is based on sustainable design and state-of-the art programming and interior planning. The new library will be relocated to the northern end of the revitalized Lincoln Park with dual entries to engage park users and the surrounding neighborhoods to the north. A revitalized Lincoln Park has been designed with walkways, lighting and landscaping to create multiple activity zones and improved amenability and public safety. 

The City Hall and Port headquarters are designed as separate and distinct buildings to meet their respective programming and security requirements, as well as to create a modern and efficient workplace environment. The separate buildings have shared facilities and both open to the new Civic Plaza. The new City Hall, Port headquarters and Main Library are each designed to achieve a LEED Gold rating.

Street view of the new Long Beach City Hall building and the Port of Long Beach headquarters

Innovations

The Project is the first social infrastructure project in the U.S. to be financed using a taxable private placement solution. Plenary had initially proposed using tax-exempt lease revenue bonds to finance the Project but moved to the private placement solution because it offered lower financing costs and better risk allocation for the City of Long Beach. Plenary also raised short-term construction financing to fund the design and construction of a new Port headquarters building. 

The Project is the first hybrid DBFOM deal in North America combining both public infrastructure and private development components within a single project.

This hybrid approach enabled the City to achieve its affordability targets and also allowed the Plenary-led consortium to deliver a vibrant masterplan combining, civil, commercial and residential elements in a cohesive manner which will revitalize the entire downtown area.

Local economic impacts

An estimated 8,000 jobs will be created through the life of this project and PPLB has committed to a hiring plan that includes a local hire and a small business focus. In preparation for the project, PPLB hosted a job fair to get Long Beach residents into the job training pipeline, and has continued to engage local employment organizations and elected leaders to ensure a strong local hire contingent.

The project is also expected to generate over $1.3 billion in economic impacts and will revitalize the heart of downtown Long Beach with new civic and commercial elements. Bringing the Port of Long Beach downtown and adding 1,000 new residents will breathe new life into a historic and cherished part of the City’s core. Finally, the project will result in over $1.0 million in annual taxes that will flow directly the City of Long Beach.

Related projects

UC Merced 2020 image

UC Merced 2020

The UC Merced 2020 Project is a 1.2 million gross-square-foot campus expansion and redevelopment project on the UC Merced campus…

Americas
William H. Gray III 30th Street Station Redevelopment image

William H. Gray III 30th Street Station Redevelopment

A large-scale restoration and renovation project is now underway at the William H. Gray III 30th Street Station in Philadelphia.…

Americas
Library and Archives Canada’s Gatineau 2 Project image

Library and Archives Canada’s Gatineau 2 Project

Library and Archives Canada’s Gatineau 2 Project involves the design, construction, financing, facility maintenance, and lifecycle of a new archival…

Americas
Plenary Americas


©️ Plenary Americas 2024