Masthead Image

New Adult Mental Health and Addictions Facility

ProjectNew Adult Mental Health and Addictions Facility
The brand logo
Asia Pacific

The New Adult Mental Health and Addictions Facility will be an addition to the existing Health Sciences Centre campus and includes a 240,000 square-foot, six-storey, 102-bed hospital; a new 60-bed hostel to replace the Agnes Cowan Hostel; and, a parking garage with space for 1,000 vehicles.

Project facts

Location

St. John’s, Newfoundland and Labrador, Canada

Client

Government of Newfoundland and Labrador

Eastern Regional Health Authority

Value (NPV)

C$330 Million

Consortium

Avalon Healthcare Partnership

Plenary Americas' role

Developer

Equity investor

Builder

Marco/Cahill Mental Health Partnership

Architect

B+H Architects

Services

Cahill Facility Management Ltd.

Financial close date

October 2020

Completion date

October 2024

Contract terms

30 years, DBFM

Design features

The NAMHAF building carefully provides a modern aesthetic that showcases open-air green cascading terraced courtyards that are oriented to St. John’s major arterial road – Prince Philip Drive.

The angled form of the inpatient tower has been designed to ensure rich daylighting of the patient spaces. The vast majority of patient and Hostel bedrooms will receive direct daylight, and the social spaces such as the lounges, television rooms, and dining rooms have been arranged to receive direct daylight regardless of the floor.

Connection to the Health Sciences Centre (HSC) and Campus:

  • The Facility is designed to make a simple, strong, accessible and direct connection to one of the HSC’s principal public spines and amenity areas.
  • The new site plan enhances and connects the natural amenity of the wetland to the pedestrian routes of the Facility and HSC.
  • The Facility has four connections to the HSC – to interconnect service flows, patient transfers, public connection and staff connection efficiently into corresponding zones of each building.

The Facility accommodates a new truck turnaround space at the existing loading dock, simplifying campus operations and improving logistical connections.The New Adult Mental Health and Addictions building has been designed to achieve LEED® Silver Certification.

Aerial rendering of the New Adult Mental Health & Addictions Facility

Innovations

The facility will maximize operational efficiency by: minimizing staff travel distances, optimizing energy efficiency through technical detailing, and delivering a complex set of programmatic requirements while keeping future flexibility in mind. Examples Include:

  • Implementation of Snow Melt systems at all of the terraces – improving year-round availability of exterior space.
  • Optimization of the exterior envelope to reduce energy consumption.
  • Placement of Elevator Cores – reducing staff travel distances and improving staffing efficiencies.
  • Efficient location of the Forensics Unit on the Ground Floor – improving safety and security for staff, patients and visitors.
  • Construction of the Hostel on a single floor – Reducing staffing requirements for the Authority and improving operational efficiency.

Local economic impacts

Over the course of construction, more than 400 jobs are expected to be created with 200 workers expected onsite at peak construction.

During the construction phase, Avalon Healthcare Partnership will:

  • Host a job fair for skilled labourers looking to work on the construction;
  • Develop an apprenticeship training program for local apprentices; and
  • Develop a plan to assist with hiring tradeswomen to work on the construction site.

Related projects

Corner Brook Acute Care Hospital (new Western Memorial Regional Hospital) image

Corner Brook Acute Care Hospital (new Western Memorial Regional Hospital)

As a major regional healthcare centre, the new Western Memorial Regional Hospital is a civic landmark inspired by what makes Western Newfoundland…

Americas
Corner Brook Long-Term Care image

Corner Brook Long-Term Care

The new Corner Brook Long-Term Care Project is a state-of-the-art elder care campus representing best practices in urban and architectural…

Americas
Centre for Addiction and Mental Health Phase 1C image

Centre for Addiction and Mental Health Phase 1C

The Centre for Addiction and Mental Health Phase IC redevelopment project will see the construction of two modern buildings along…

Americas
Asia Pacific